000 01162nam a2200205Ia 4500
999 _c3985
_d3985
008 200103s 2004 ||||xx |||||||||||||| ||und||
020 _a1870077660
082 _a387.2068
_bSWI
100 _aSwift, A.J.
245 0 _aBridge team management : a practical guide
250 _a2nd
260 _bThe Nautical Institute
_c2004
_aLondon
300 _a118
504 _a1. Bridge team management 2. Passage appraisal 3. Passage planning 4. Executing the passage/voyage plan 5. Monitoring the ship's progress 6. Teamwork 7. Navigating with a pilot on board 8. Navigating with integrated bridge and electronic chart systems 9. Guidance on keeping a navigational watch with reference to STCW95 Code Part B Chapter VIII Part 3-1 with commentary 10. IMO resolution A 893(21) Passage Planning with commentary
650 _aNavigating with integrated bridge and electronic chart systems
650 _aGuidance on keeping a navigational watch with reference to STCW95 Code Part B Chapter VIII Part 3-1 with commentary
650 _aIMO resolution A 893(21) Passage Planning with commentary
700 _aBailey, T. J.
_eCo-author
942 _cBK